Host Hotel & Resorts has awarded Clark a $70 million contract for the New Marriott Hall located in San Diego.

Designed by tvsdesign, the 171,000 square-foot facility will be constructed adjacent to the existing north tower of the San Diego Marriott Marquis and Marina. The new 72,000 square-foot structure will replace the existing Marriott Hall and will provide a larger, modernized space for conferences and events.

Clark will first demolish the existing structures next to the north tower. Once the tower is secured, Clark will then demolish the existing hall to grade level. After the demolition work is completed, renovations will be made to the existing base of the north tower. Clark will then construct a two-level, steel-framed structure, which will be integrated into the existing tower. A mechanical upgrade, including the installation of chillers, cooling towers, and hydronic lines, also is included in the scope of work.

The New Marriott Hall is designed to achieve LEED® Silver certification.

Substantial completion is scheduled for the summer of 2016.