Water Treatment Plant Clearwell No. 2 includes the installation of a 1.25-million-gallon clearwell tank, 250 linear feet of 48-inch ductile iron process (DIP) piping, 290 feet of 36-inch DIP piping, and a cast-in-place chemical feed vault. The scope of work also includes HVAC and electrical modifications to support the new equipment and site improvements such as relocating an existing access road, extending a storm drain outlet, and site grading.